A A A
Waste Water Treatment Plant and Water Purifying Stations

   “HYDROSTROY” AD has built the following more important projects:

 

 

WESTE WATER TREATENT PLANT IN THE TOWN OF PLOVDIV-ENLARGEMENT AND RECONSTRUCTION

 

 

 

 

Capacity: 294 600 m³/24 hours.

Population of the settlement: 400 000 inhabitants.

Secondary Radial Settlers:

- diameter – 40 m;

- height – 5 m;

Pumping station with air blowers

- total capacity of the pumps - 4 500 l/sec;

- total air blowers capacity - 58 600 m³/hour;

 

 

WESTE WATER TREATENT PLANT IN THE TOWN OF ETROPOLE

 

Capacity: 18 250 m³/24 hours.

Built-up area – 10.00 decares

For equivalent population: 25 000 inhabitants.

Secondary Radial Settlers:

 - diameter – 25.00 m;

- height – 5.00 m;

Pumping station:

- total capacity of the pumps – 2 600 l/sec;

Conductive collector - Ø 1000 mm.

 

WESTE WATER TREATENT PLANT IN THE TOWN ROSTOV  ON  DON - RUSSIA

 

 

 

Capacity: 3 400 m³/24 h sewage and rain water.

Built-up area – 21 decares.

For equivalent population: 30 000 inhabitants.

Secondary Radial Settlers:

- diameter – 25.00 m;

- height – 8.50 m;

Pumping station with air blowers

- total air blowers capacity – 22 000 m³/hour;

 

 

WESTE WATER TREATENT PLANT IN THE TOWN OF TSAREVO

 

Capacity: 4 200 m³/24 hours.

Built-up area – 9 300 m²

For equivalent population:

- І stage – 14 500 inhabitants;

- ІІ stage – 65 000 inhaboitants.

Secondary Radial Settlers:

- diameter – 20.00 m;

- height – 4.50 m;

Pumping station with air blowers

- total capacity of the pumps - 50 l/sec;

 

 

WESTE WATER TREATENT PLANT IN THE TOWN OF MADAN

 

 

 

Capacity: 4 320 m³/24 hours.

Built-up area – 8 000 m²

Population of the settlement:

- І stage – 10 000 inhabitants;

Secondary Settlers:

- dimmensions – 35.00 m / 4.75 00 m;

- height – 5.00 m;

Pumping station with air blowers

- total air blowers capacity - 1200 m³/hour;

Sewer – D 800 mm.,

Duration of construction – 12 months.

 

 

WESTE WATER TREATENT PLANT IN THE TOWN OF ZLATOGRAD

 

 

 

 

Capacity: 4 320 m³/24 hours.

Built-up area – 8 000 m²

For equivalent population:

- І stage – 10 00 inhabitants;

Secondary Settlers:

- dimentions – 35.00 m / 4.75 m;

- height – 5.00 m;

Pumping station with air blowers

- total air blowers capacity – 1200 m³/hour;

Sewer Main – D 500 mm.,

Duration of construction – 12 months.

 

 

WATER PURIFYING STATION IN THE VILLAGE OF VRACHESH, MUNICIPALITY OF BOTEVGRAD

 

Capacity: 1 300 m³/24 hours (15.00 l./sec).

Total built-up area – 2 400 m².

Population of the settlement: 3 000 inhabitants.

WATER PURIFYING STATION YOVKOVTCI, MUNICIPALITY OF VELIKO  TARNOVO

Capacity: I-st stage - 70 000 m³/24 hours.

              II-nd stage – 175 000 m³/24 hours.

Total built-up area – 20 000 m².

Population of the settlement: 400 000 inhabitants.

 

 

Copyright © Hydrostroy AD 2008-2018 All rights reserved
Design & support by Plan C Ltd.

We use cookies to improve our website and your experience when using it. Cookies used for the essential operation of the site have already been set. To find out more about the cookies we use and how to delete them, see our privacy policy.

I accept cookies from this site.
EU Cookie Directive plugin by www.channeldigital.co.uk